Monday, October 27, 2014
day 2 coffee table with glass drawers
Second day work. Since all refab is done in the apt we have to become creative on when and where we can do certain things. This today being gluing some of the joints just as a precautionary measure. We put all the joints back together with the supplied screws and anchors. But just to be safe I added a little bit of the Elmers wood glue on the pegs. Pressing it in the hallway so that hopefully its out of the way before the Mrs . returns. We spent a lot of time last night working (sanding) down most of the components. The only part I have concerns over is the top piece and its ability to be made 100 percent flat and level.
After 45 minutes or so I will set it back up and document where we stand as of Monday at 2pm...
Its a lot more effort doing all this work in our 1 bedroom aptm. If it were 2 I could at least commendere one of the rooms for my work and painting. Until then though...
Subscribe to:
Post Comments (Atom)




No comments:
Post a Comment